Greenfire Resources Ltd. (GFR)
NYSE · Mining & Energy · Crude Petroleum & Natural Gas
- Price
- $6.08
- Day
- -3.65%
Close 2026-09-23.
The company
About 80% of Alberta’s bitumen reserves are too deep to be mined and must be extracted in-place (or in-situ) using steam, whereby bitumen is heated and pumped out of the ground, leaving most of the solids behind. In-situ extraction has a much smaller footprint than oil sands mining, uses less water, and does not produce a tailings stream. SAGD uses a dual-pair of horizontal wells drilled approximately five meters apart, one above the other. Well depth can vary anywhere from 150 to 450 meters and length can be over 1,600 meters. High pressure steam is injected into the top well, or the injection well, and the hot steam heats the surrounding bitumen. As the bitumen warms up, it liquefies and, due to gravity, begins to flow to the lower well, or the producing well. The bitumen and condensed steam emulsion contained in the lower well are pumped to the surface and sent to a processing plant, where the bitumen and water are separated. The recovered water is treated and recycled back into the process and the bitumen is typically diluted with natural gas condensate, and sold to market. Both the Demo Asset and the Expansion Asset use SAGD to produce bitumen reserves. Both the Demo Asset and Expansion Asset are considered by the Company to be Tier 1 SAGD reservoirs in that they have no top gas, bottom water or lean zones. Top gas, bottom water or lean zones are considered “thief zones” as they provide an unwanted outlet for steam and reservoir pressure.
Institutional holders
Largest positions reported on Form 13F for the quarter ended 2026-06-30, by value.
- Moerus Capital Management LLC — $12.61M
- WEXFORD CAPITAL LP — $11.46M
- Nokomis Capital, L.L.C. — $9.11M
- Nokomis Capital, L.L.C. — $9.11M
- AEGIS FINANCIAL CORP — $4.39M
- K2 PRINCIPAL FUND, L.P. — $4.07M
- Saber Capital Managment, LLC — $3.82M
- LOUISBOURG INVESTMENTS INC. — $3.74M
Recent filings
- 6-K — 2026-09-17
- 6-K — 2026-09-17
- 6-K — 2026-08-14
- EFFECT — 2026-08-10
- F-10/A — 2026-08-07
- F-10/A — 2026-08-05
- 6-K — 2026-08-05
- F-10 — 2026-07-27
- 6-K — 2026-07-22
- 6-K — 2026-07-13